Operation Manual D-480 ©BÜCH Labortechnik AG
6 - Heating up the furnace / checking parameters 118
In case the analyzer has to be transported, mount the corresponding transport protection(s)
again.
Note
Note the following:
The following section is part of initial start-up. All steps described in initial start-up before "Heating up
the furnaces / checking parameters" must have already been performed. See Start-up (on page 109).
Some instrument parameters can not only be defined in the "Device parameters" dialog but also via a
method. The following general rule applies:
If not otherwise defined by a method, the settings in the "Instrument parameters" dialog apply.
If a parameter is defined differently in the method and in the "Device parameters" dialog, the
method takes priority if it is used for the measurement.
Heating up the furnace / checking parameters
Safety instruction
Strictly observe the safety instruction "Overheating of tube fillings" under Warning notes during
operation (on page 24).
Proceed as follows:
Open the "Device parameters" dialog in the operating software by selecting Options > Settings
> Parameters.
Check furnace working temperatures in the "Temperatures" selection and change them if
necessary. See Setting instrument parameters (on page 50).
Check the other parameters in the "Times" selection and change them if necessary.
Click OK to confirm your settings. The settings are applied.
Heating up the furnace / checking
parameters