4 Description of function
27 R-220 SE Operation Manual, Version F
4.3.2 Vaccum routing
General memory aid for vacuum routing
Independent of the installed glassware setup the vacuum pump has to be connected at the end of
the cooling path. Depending on the used setup this can either be subsequently at or after the last
condenser.
Example 1:
Vapor temp. sensor
End of cooling path
Connection to vacuum source
Connection to vacuum controller
Vapor path
NOTE
In case the Rotavapor is not equipped with a vacuum controller a blind cap must be used to close
the vacuum controller connector to achieve a tight setup. The vapor temperature sensor always has
to be installed before the vapor inlet of the first condenser.