5 Putting into operation
64 R-220 SE Operation Manual, Version F
NOTICE
Risk of instrument damage by wrong mains supply.
External mains supply must meet the voltage given on the type plate
Check for sufficient grounding
5.18 Adjusting the snap flange
System tightness is essential when working with a Rotavapor. Thus, the snap flange assembly should
be checked at every evaporating flask installation. This is necessary since every glassware has its
unique fitting accuracy.
Clockwise = increasing the tension
Counterclockwise = decreasing the tension
When passing the top dead center of the closing mechanism a clear resistance must be felt.
Moving the lever must never require excessive force!
If the required lever force is too weak the flange may not be thight and will wear out the PTFE seal.
In this case, increase the tension of the closure.
If the required lever force is too high (e.g. the lever can not be shifted over the top dead center)
reduce the tension of the closure.