Buchi Rotavapo R-100 Manual do Utilizador Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
BÜCHILabortechnikAG Installation|5
OperationManualRotavapor®R100 21/60
5 Installation
5.1 Installationsite
Theinstallationsitemustmeetthefollowingrequirements:
Firmandlevelsurface
Spacerequirements:atleast620mmx510mm(WxD)
Ifdistillingundervacuum,theremustbeafumehoodavailable.
Whereverpossible,theRotavapor®R100shouldbesetupinsidethefumehood.
Ifthatisnotpossibleforreasonsofspace,itcanalsobesetupoutsideifthesafety
guard(optionalaccessory)isfittedandtheresidualvaporsarefedintothefume
hood.
5.2 Mountingtherotarydriveunit
IMPORTANT
Riskofpropertydamageduetorotarydriveunitfallingoff
u Makesurethatthescrewforfixingtherotarydriveunitengagessecurelyinthe
grooveinthetowermount.
u Sliderotarydriveunit(2)ontothetowermount(1).
u Tightenscrew(4)tolocktherotarydriveunitinthegroove(3)sothatitcannotbe
pulledoff.
u Tightenthelockinglever(5)fortheimmersionangle.
u Checkthattherotarydriveunitcannotbepulledoffortwisted.
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 59 60

Comentários a estes Manuais

Sem comentários